Custom and private label version of the SL-I075A 22 L backpack cooler. High-frequency welded TPU shell and food-grade liner, airtight zip, IPX7. Customizable colour, logo, liner print, size, insulation up to VIP panel, harness, accessories and packaging. MOQ 300 per colour, samples 7–15 days, production 30–35 days.
Custom soft cooler, base models SL-I082A / SL-I083. Standard 38 × 25.5 × 32 cm (approx. 16 L, about 20 cans) and 44 × 39.5 × 32.5 cm (approx. 30 L, about 40 cans); welded TPU shell, 20 mm closed-cell foam, food-grade welded liner, airtight zip, IPX7. Custom options: Pantone shell, trim, pocket and webbing; patch, screen print, heat transfer, raised silicone print; liner colour or all-over print; new sizes; 30 mm foam, PU foam or VIP panel; water-resistant zip option; accessories; colour box, set box or gift pack. MOQ 300 pcs per colour per size; samples 7–15 days (20–25 with tooling); production 30–35 days. ISO 9001, BSCI, SMETA, Higg, GRS, SCAN. Factories in Guangdong, China and Ho Chi Minh City, Vietnam.
SL-C529 is an insulated cooler tote, 50 × 30 × 30 cm and about 30 L, holding around 36 cans without ice. Canvas-texture TPU-laminated shell, 12 mm closed-cell EPE foam and a high-frequency welded food-grade TPU liner. Airtight top zip, IPX7 and leakproof in any orientation. Twin tote handles on welded patches, front daisy chain, end D-rings for an optional strap. Khaki and light grey. MOQ 300 pcs, samples 7–15 days.
Model SL-I323. Outer 46 × 17 × 35 cm; approx. 20 L, about 24 × 330 ml cans without ice; approx. 1.3 kg; recommended load up to 15 kg. Material 840D TPU tarpaulin + EPE foam + PEVA film liner; high-frequency welded shell. Airtight waterproof zip-around lid; IPX6, leakproof upright. Lid zip pocket; front slip pocket; seatbelt webbing tote handles; TPU side grab handles; detachable padded shoulder strap with carabiner-style snap hooks. Ice retention approx. 24 hours under stated conditions. Colours black, grey; welded TPU liner on request. MOQ 300 pcs; lead time 30–35 days after sample approval. ISO 9001, BSCI, SMETA, Higg, GRS, SCAN. OEM/ODM from Guangdong China and Ho Chi Minh City Vietnam.
Model SL-I126. Outer 48 × 26 × 36 cm; approx. 35 L; approx. 1.1 kg; recommended load up to 15 kg. Shell coated polyester; insulation 10 mm closed-cell foam; wipe-clean coated liner; sewn lockstitch construction with bound edge and bar-tacks. Three-side zip lid with double sliders; front zip pocket; side mesh pocket; tote handles; detachable padded shoulder strap on moulded anchors. Water-resistant, not leakproof; cold holding approx. 12 hours with ice packs under stated conditions. Olive green; custom colours; welded leakproof liner on request. MOQ 300 pcs; lead time 30–35 days after sample approval. ISO 9001, BSCI, SMETA, Higg, GRS, SCAN. OEM/ODM from Guangdong China and Ho Chi Minh City Vietnam.
SL-I075A is a 22 L backpack cooler, 33 × 24.5 × 51 cm, holding about 36 cans without ice. High-frequency welded TPU shell, 20 mm closed-cell foam and a welded food-grade liner. Airtight zip, IPX7 and leakproof in any orientation. Lid zip pouch, two side mesh pockets, front shock cord, bottle opener. Padded shoulder straps, sternum strap and hip belt. Aqua, yellow and blue. MOQ 300 pcs, samples 7–15 days.
A waterproof soft cooler keeps water out and meltwater in. Look at the shell fabric, the seams, the liner and the closure, and choose a size by how many cans or how much food it needs to hold.
Every order passes through incoming material inspection (IQC), in-process checks (IPQC) and final inspection (OQC), with SGS or QIMA third-party inspection available on request, and colour and logo are checked against the approved sample.
Usually 300 pieces per style; some models start at 200 or 500. Colours can often be split within one order.
Price depends on the material, size, closure, features, logo method and order quantity. Send us your specification or a reference sample and target quantity, and we will quote.
Yes. Screen printing, heat transfer and welded patches are the most common methods, and we can match Pantone colours for the fabric, webbing and zip pulls.
Samples usually take 7–15 days and bulk production 30–45 days after sample approval, from our factories in China or Vietnam.